Townhouse Development — Logan
Logan, QLD202410 monthsOneFin

48-townhouse residential development in Logan — full civil engineering package including earthworks, shared driveway, stormwater, and utility design.
The Challenge
The site had significant cut-and-fill requirements across an undulating terrain, with the bulk earthworks needing to be balanced to avoid costly haulage off-site.
Our Solution
We used Civil 3D to optimise the earthworks design to within 200 m³ of balance, saving the client an estimated $150,000 in haulage costs. The shared driveway was designed to accommodate both standard passenger vehicles and waste collection.
Outcomes
- Earthworks balanced to within 200 m³ — $150K saving
- DA approved on first submission
- All 48 townhouses settled on time
Services Delivered
Design & PlanningInfrastructure DesignStormwater EngineeringConstruction Phase